
Construction Materials & Steel Lifted · Perth
Pallet of bricks on a second-storey slab. I-beam craned straight into the wall. Done before smoko — no double handling.
How it works.
Builders, framers, and landscapers use a HIAB crane truck to put heavy materials exactly where the trades need them — on the slab, over the scaffold, onto the roof. Saves a day of carrying by hand and saves a back.
Structural steel is the one that pays for itself. I pick the i-beams, lintels, and PFCs up from the supplier, run them to your site, and crane the steel straight into position — same job, one truck. No flat-bed drop on the verge, no second machine to lift it off, no double handling. The builder's not standing around waiting and the steel goes in clean.
Other gear I run week in, week out: pallets of bricks onto second-storey slabs, timber packs lifted over fences onto build sites, roof sheets placed onto trusses ready for the fixer. Residential builds and commercial sites both — same truck, same rate.
For regular construction work, same-day bookings or scheduled-ahead slots both work. Get a quote once, share it with the team, and we're away.

- Pricing
- Travel-based from Darch
- GST
- Included in every price
- Quote format
- On-the-spot estimate
FAQs.
Can you do steel beam delivery and install in one job?
That's the whole point. I pick the steel up from the supplier, deliver it to site, and crane it into position on the same callout — no double handling, no second machine, no waiting around for the builder.
Do you handle i-beams and lintels for residential builds?
Yes — i-beam lifting and lintel installation are standard work. Most Perth residential builds need a beam or two craned into the wall line; the HIAB places them straight off the truck.
Do you do ongoing work for builders?
Plenty. I run regular lifts for Perth builders, landscapers, and framers across residential and commercial sites. Lock in a recurring slot or book job by job — whatever works.
What's the weight limit?
Single lift capacity depends on reach. At close range heavier loads are fine; at max reach (~15m) capacity drops. Send the load weight and position and we'll confirm.
Get a real price in 20 seconds.
Enter the job, the numbers run automatically from the depot, the estimate lands on screen. If it works, we book. Simple.
All Perth metro.
We run construction materials & steel lifted jobs right across Perth metro — some of the most common areas below. The quote tool handles every suburb from the depot in Darch.
Other HIAB work we handle.
Fence in the way? No access down the side? That's exactly what a HIAB was built for.
Read moreHeavy aircon unit, two-storey roof, no scaffold. One truck, one operator, ten minutes in the air.
Read moreExcavation's done, pool shell's on the truck. Let's get it in the ground.
Read more